1 Ton Per Batch Malting Equipment Germinating And Kilning Box For Malt Plant

Negotiable
MOQ
Negotiable
Price
1 Ton Per Batch Malting Equipment Germinating And Kilning Box For Malt Plant
Features Gallery Product Description Request A Quote
Features
Specifications
Voltage: 220V Or 380V Or Customized
Material: SUS304
Type: Germinating And Kilning Box
Condition:: New
Application:: Produce Malt
Grain: Barley ,corn ,wheat
Capacity: 100 Kg-5tons
Highlight:

keg washer filler

,

monoblock filler and capper

Basic Infomation
Place of Origin: China
Brand Name: Gongda
Certification: CE, UL,ISO
Model Number: GD-ZMJ-1000
Payment & Shipping Terms
Packaging Details: iron frame /plate
Delivery Time: 40-50 working days
Payment Terms: TT
Supply Ability: 20 sets per month
Product Description

1 Ton Per Batch Malting Equipment Germinating And Kilning Box For Malt Plant

 

 

1
Germinating and kilning box

1.

Capacity: 1T/Batch; Including Sieve Plate
2.Length*width*height:

will be designed according to your plant area;
3.Chest Wall Thickness: 2mm
4.

Malt Turner Boosting Speed:
0.4-0.5m/Min;
5
Malt Turner Rotating Speed:8-9R/Min


set
1  SS304

 

NOTE:

1. The above price is based on EXW Qihe basis.

2. Payment Term: T/T (50% payment in advance, 50% before shipment)

3. The offer is valid in 30days.

4. This price doesn’t include the installation and testing costs in field fabrication.

5. If buyer asks seller to provide staffs to install and adjust equipments, buyer is responsible for these staffs’ tickets, visa, wages, accommodation.

 

 

 Operation
1) Turn on master switch for power supply.

2) Turn on water valve to add water into all water tanks. Be sure to reach water level specified. Turn on compressed air valve.

3) Press temperature control buttons to preheat water in tanks.

4) Set sterilizing temperature and temperature alarm (upper limit temperature and lower limit temperature) in Temperature controller. In general, you just need to set sterilizing temperature.

5) Turn on steam valve manually to preheat water in water tank at cooling section. Water temperature is displayed on thermometer.

6) When water temperature reaches the set point (PV display area), start bottle input /output conveyors to transfer full bottles into this machine.

7) When you finish sterilizing operation, you shall turn off steam valves and water supply valves at first, then stop all spray pumps, at last, stop mesh belt conveyor and bottle input /output conveyors.
.

 

Recommended Products
Get in touch with us
Tel : 13006598856
Characters Remaining(20/3000)